The repair of some humidity and filtrations, turned out to be the full rehabilitation of this historical building

The repair of some humidity and filtrations, turned out to be the full rehabilitation of this historical building

Architects: arn Arquitectos
Location: Alicante, Spain
Year: 2017
Photo courtesy: David Frutos
Description:

“Sometimes the fact of building is just about erasing layers. This is the basis of the project for the refurbishment of the “Posito Pesquero”. How to rediscover the inner architecture has been hidden for years.

What initially was meant to be the repair of some humidity and filtrations, turned out to be the full rehabilitation of this historical building, which dates to 1860, to its original value.

During the intervention it becomes self-evident that, the different actions executed over time on the building, as well as the evolution of the building´s purpose, have provoked the initial condition, together with the composition and the cavities in its facade, to be found completely modified and detracted from its initial aspect due to its constant adaptations towards its current function, making it unrecognizable when compared to its initial aspect and projection.

Externally, the walls were found covered by different layers of paint and mortar. Internally, a brick wall covered with tiles, hid the original ashlar and masonry walls. Two levels of false ceilings placed at different heights prevented the view of the original wooden structure which composed the roof of the building.

An interior redistribution of the existing surface area is suggested, as well as a small expansion which takes advantage of the spatial dimensions in order to, by creating a double-height, offer the possibility of savoring the building from unknown points of view, placed on different levels and allowing to put value on highly important and singular elements such as the original wooden structure that forms the roof.

An extensive consolidation and cleaning process is carried out with several actions towards its maintenance and recovery.

For this process, the different layers of paint and mortar that covered the external facade are removed in order to allow for the visibility of the load-bearing masonry walls with elements of brick, plinth, border and cornice.

The original composition of the cavities in the facade is recovered by eliminating the cavities generated by the new functional use of the building. In this case, functionality had been prioritized however not respecting its original look given its dimensions and locations.

The original roof tiles are recovered and polished up as well as provided with the necessary isolation and water-resistant treatment for its current use. The exterior aspect of plain roof tile is also recovered.

Latest News

How To Organise Your Pantry’

How To Organise Your Pantry' Pantries are often known to be areas of great chaos. You practically store a lot of stuff inside and sometimes,...

Tackling Retail Security Challenges in 2020

Tackling Retail Security Challenges in 2020   Shoplifting costs Canadian retailers up to $5 billion a year. Combined with employee theft, vendor fraud, and cybercrime, it’s...

Olympia Prairie Home by Coates Design

Olympia Prairie Home by Coates Design, a contemporary take on a country Washington home Architect: Coates Design Location: Yelm, Washington, United States Photography: Lara Swimmer The designer’s task...

Outside In Minimalist Villa by i29 + Bedaux de Brouwer Architects

Outside In Minimalist Villa by i29 + Bedaux de Brouwer Architects Architects: i29, Bedaux de Brouwer Architects Area: 400 m2 / 4300 sqft Year: 2020 Contractor: Van Gisbergen Cabinet...

More Articles Like This